Network Rail is currently rolling out a new digital Railway Communications System (RCS) across Britain’s rail network. This will allow direct, continuous and secure communication between train driver and signaller, which will considerably improve safety, reliability and punctuality for all passengers. RCS is replacing the existing legacy system, Cab Secure Radio (CSR), which is outdated, does not provide the required coverage and is becoming increasingly more expensive to maintain. This new network is solely for the delivery of the Railway Communications System and will not be used by commercial mobile telecoms operators. In
order to
implement the new system, around 2,200 railway communications masts are
required, one of which is needed near Croxley Green and one near
Chorleywood
station to provide 100% coverage on this section of the Chilterns line.
The siting of any communications mast is sensitive. Before a
site is selected they consider a number of factors:
The sites Over recent months Netowrk Rail have been investigating a number of possible locations for the railway communications masts and equipment cabins in the area. During this time they have held a meeting with planning officers at Three Rivers Council about these proposals. Following this and after a number of site investigations they have identified two sites that fit their criteria. These are: Croxley Green: just west of the intersection of the Chilterns line and Grand Union canal a 20m lattice mast is proposed. Please see attached PDF document detailing a map with the proposed location indicated by an “X.” Chorleywood: approximately 230 metres east of Chorleywood station platform a 20m monopole mast is proposed. Please see attached PDF document detailing a map with the proposed location indicated by an “X.” Each location was chosen for the following reasons:
Network Rail are planning “drop-in” sessions, attended by members of the project team, to be held towards the end of March and they will invite local residents through a leaflet drop over the next couple of weeks. If you have any queries or would like be briefed on these proposals please do not hesitate to contact Simon Hopkins/Communications Executive directly on 020 3356 8727 or email: Simonhopkins2@networkrail.co.uk |
Archived News > Transport >